A successful fire evacuation drill event phase 1 29th November 2018. Bomba compliant event

Date: 29th November 2018

Time: 10.30am – 11.30am

Venue: Plaza Sentral

Phase 1: Block C&D

Block C&D + Block 1A EPF only
Block C = 22 + Block D = 13 total = 35 floors
Block 1A = 17 floors

Assembly point: ERL departure hall KL Sentral

Authority body: Jabatan Bomba & Penyelamat: Balai Bomba Jalan Pantai , Tuan Hamid Bin Daud & 10 Personnel Together With The Arrival Of Bomba Fire Brigade

Total evacuation respond time: 25 mins

Manning in total head count at the: 22 ERT team

Assembly point:Block C 3A 3B = 1264 & D = 431 total = 1695 /  Block 1A = 380

Contractors:fire contractor (kaiser), lift (antah schindler), ambulance: (ambulance)